How to Read an Aerogel Datasheet Without Being Misled

How to Read an Aerogel Datasheet Without Being Misled

Insulation datasheets are technically accurate and frequently misleading at the same time, because the selection of what to print is itself a sales decision. Here is how to read one critically, including ours.

Thermal conductivity: ask for the curve, not the number

A single conductivity value is almost always quoted at 25 C, and for a hot service application it is close to useless on its own. Conductivity rises with temperature, sometimes by a factor of three or more across a product range. Always ask for the full curve and use the value at your actual mean temperature. A supplier who will not provide the curve is telling you something.

Maximum service temperature: ask what fails first

Maximum service temperature is a judgement, not a physical constant. Ask what happens at that limit: does the material shrink, slump, lose hydrophobicity, or simply perform worse? Ask for shrinkage data after sustained exposure, because a blanket that shrinks three percent opens gaps at every joint and the installed system fails long before the material does.

Density: relevant, but not how you think

Density mostly tells you about handling, shipping weight and load on supports. It is a poor proxy for thermal performance. Do not let a density comparison stand in for a conductivity comparison.

Hydrophobicity: ask how it was measured, and how it ages

  • Which test method, and at what temperature
  • Is the material hydrophobic throughout its thickness or only at a facing
  • Does hydrophobicity survive extended exposure at service temperature
  • What happens after a wet-dry cycle, which is the real service condition

Fire performance: the words matter enormously

Non-combustible, fire resistant, fire rated and jet fire tested mean four different things. A material can be non-combustible and still provide no useful protection duration. Ask for the test standard, the report number and the tested build-up, and check that the build-up matches what you intend to install.

What is never on the datasheet but should be asked

  • Batch to batch consistency and whether a certificate of analysis is provided
  • Lead time and minimum order quantity for your actual sizes, not standard stock
  • Whether an installation guide and contractor training are available
  • What the supplier will put in writing versus what they will only say on a call
  • Whether they will tell you when their product is the wrong choice